worklog 12/28

Inaugural work in the new garage workshop! Nothing major, just drilled the jackplate for the marquee, and installed the power connector. I also put another coat of poly on the frame. Looks shiny!

jackplate and power connector

On the 3D printer front, I got the heated bed PCB soldered and installed the endstop switches. Soon!

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>