worklog 12/28

Image

Inaugural work in the new garage workshop! Nothing major, just drilled the jackplate for the marquee, and installed the power connector. I also put another coat of poly on the frame. Looks shiny!

jackplate and power connector

On the 3D printer front, I got the heated bed PCB soldered and installed the endstop switches. Soon!